How It Works The Work Additions About Brad Start a Project

Clean Construction / Home Additions / Elyria, Ohio

Home additions in
Elyria, Ohio.

Room additions and in-law suites for Elyria — new foundations tied to century-old ones, siding matched to the house, and one crew from excavation to final trim. Brad Skvor manages every phase.

Call Brad directly 440-315-4438
Additions — Elyria

More house, without leaving
the house you love.

A lot of Elyria families hit the same wall: the house is genuinely worth keeping — real woodwork, a real neighborhood near downtown or the Black River, a yard the kids already know — but the floor plan ran out of room a kid or two ago. Moving trades away everything that makes the house yours. An addition keeps all of it and fixes the one thing that's wrong: the square footage.

On Elyria's older housing stock, the craft is in the tie-in. A new foundation has to meet one that was poured — or laid up in block or stone — generations ago, and the two have to carry their loads together without the new corner settling away from the old. Brad excavates, pours footings below the 32-inch frost line on undisturbed soil, and plans the drainage so the addition sheds water away from the original foundation instead of against it. When the wall between old and new comes open, headers and beams get sized for the framing that's actually in there — which on a century home can be anything.

Then the addition has to disappear into the house. Older Elyria homes carry siding profiles, trim proportions, and rooflines that a builder-grade bolt-on would insult; Brad matches them, special-ordering discontinued profiles when that's what it takes. Zoning and building permits run through the City of Elyria Building Department, and Brad handles the whole exchange — drawings, applications, every inspection.

What a Elyria Addition Demands

Four things done right,
or it never looks like it belongs.

01

A foundation tied to the old one

An addition stands or settles on how its foundation meets the existing one. Brad excavates, pours footings below Ohio's 32-inch frost line on undisturbed soil, and details the connection so the new structure and the old one carry their loads together — with drainage planned before the pour, not after the first wet spring.

02

Load paths opened, not guessed

At some point the wall between old and new comes open, and everything above it needs somewhere to stand. Brad walks the existing structure first — foundation, framing, mechanicals — and sizes headers and beams for what's actually there. He's building onto your home, not around it.

03

Dried in fast, matched outside

Windows get staged early so there's no dead gap between framing and weathertight. Then the siding, soffit, fascia, and roofline get matched to your existing home — and if that means special-ordering a discontinued profile, Brad orders it. Close enough isn't good enough.

04

Zoning, permits, and inspections handled

An addition means zoning setbacks, a building permit, and trade inspections through the City of Elyria Building Department. Brad handles the drawings, applications, and every inspector visit. The paper trail protects the biggest investment you own when it's time to sell.

The Work

Addition work by
Clean Construction.

Addition foundation poured and tied to the existing home by Clean Construction LLC, serving Elyria Ohio
Foundation — Tied In
Crane setting roof trusses on a framed home addition by Clean Construction LLC, addition contractor serving Elyria and Lorain County Ohio
Trusses Going Up
Clean Construction crew setting roof trusses on a home addition, serving Elyria Ohio
The Crew, Setting Trusses
Completed home addition with matched siding and roofline by Clean Construction LLC, serving Elyria Ohio
Addition — Complete

Follow a full addition build phase by phase — excavation to finished room — on the additions page, or browse the full portfolio.

How Your Addition Gets Built

From conversation
to final walkthrough.

01
The Call

Tell Brad what your home is missing

A bedroom, a bigger kitchen, an in-law suite, a first-floor primary — or just "we're out of room." Vague is fine. Every addition starts as a conversation, not a bid.

02
Walkthrough

Brad walks your Elyria home with you

He wants to see how you actually live in it — where the light comes from, how traffic moves, what you're gaining and what you can't lose. Then he walks the structure: foundation, framing, mechanicals, and the lot itself. The plan comes out of that, and it's one you won't be surprised by six months later.

03
The Number

Design and a written, itemized estimate

Excavation, foundation, framing, rough-in, exterior, finish — line by line, nothing buried. Money is settled in the contract before a shovel touches your yard.

04
The Build

Every phase, one crew

Excavation, foundation inspected, framing up, licensed subs on rough-in, dried in fast, exterior matched, interior finished to the trim. No handoffs, no subcontractor you've never met making decisions — Brad manages every phase and is on site through it.

Elyria Addition Questions

Asked before every
addition Brad builds.

Do I need a permit for an addition in Elyria?

Yes — an addition is real construction and gets the full treatment: zoning review for setbacks, a building permit, and electrical, plumbing, and HVAC inspections through the City of Elyria Building Department. Brad handles the drawings, the applications, and every inspection as part of the job. You never deal with the counter.

How long does a home addition take?

Most room additions run two to four months of build time depending on size and scope — a single-room bump-out lands at the short end, a full in-law suite with a bath at the long end. Brad stages material orders early so the schedule has no dead time, and you get that schedule in writing before work starts.

Will the addition actually match our house?

That's the standard the job is built to. Siding, soffit, fascia, and roofing get matched to your existing home — special-ordered if the profile is discontinued — and the roofline gets tied in so the addition reads as original construction. When it's finished, it should look like it was always there, because it was designed to be.

Do we have to move out during the build?

Almost never. Most of the build happens outside your existing walls — the addition goes up, gets dried in and weathertight, and only then does the opening between old and new get cut. Your home stays sealed, secure, and livable through the noisy months, and the truly disruptive stretch is measured in days, not weeks.

What does an addition cost in Elyria?

It depends on size, what's in it — bathroom, kitchen work, second story — and how it ties into your home, so Brad doesn't quote blind and you shouldn't trust anyone who does. He walks your home, then you get a written, itemized estimate with every line explained. The walkthrough and the estimate cost you nothing.

Can you really tie an addition into a 100-year-old Elyria foundation?

Yes — by respecting the difference between the two structures instead of pretending it isn't there. The addition gets its own modern foundation poured below frost depth on undisturbed soil, and the connection to the old stone or block is detailed so each structure can do its job. Brad walks the existing foundation before the design is final, and if what he finds should change the plan, he tells you at the walkthrough — not at demo.

Nearby & Related

Also from Clean Construction.

Let's Talk Additions

Tell Brad what
your home is missing.

Fill this out or call him directly. Either way you're talking to the person who builds it.

Call Brad directly 440-315-4438 He picks up.
Owner Bradford Skvor
Based in Lagrange, Ohio — 15 minutes from Elyria
Serving Elyria and all of Lorain County
Response time Same day, always

Got it.

Brad will call you back the same day. If it's urgent, call him directly at 440-315-4438.

Thinking addition? Brad answers his own phone.

Call 440-315-4438 Send a message