Clean Construction / Home Additions / Medina, Ohio
Home additions for Medina — Victorian homes near the Square and newer subdivisions off Route 18, tied in structurally and matched visually so the addition looks like original construction.
Medina sets a visible standard for what buildings should look like — the Square makes sure of that — and an addition here has to clear it. On the Victorian-era streets near downtown, that means an addition that defers to the house: proportions, window rhythm, trim weight, and a roofline that ties into 1890s geometry without flattening it. Brad designs the addition to the house, not from a plan book.
The structural side of those older homes deserves the same respect. Foundations from another century, framing that predates modern code, load paths that have quietly rearranged themselves through a hundred years of remodels — Brad walks all of it before the design is final, then pours the new foundation below the 32-inch frost line and opens the connection into structure he's actually verified.
Medina's newer neighborhoods off Route 18 bring the opposite job: sound modern houses that simply need more of themselves — a family room, a first-floor suite, a kitchen that matches how the household really cooks. Materials are still in production and the match work is clean. Either way, zoning review and permits run through the City of Medina Building Department, with Brad handling drawings, applications, and every inspection.
An addition stands or settles on how its foundation meets the existing one. Brad excavates, pours footings below Ohio's 32-inch frost line on undisturbed soil, and details the connection so the new structure and the old one carry their loads together — with drainage planned before the pour, not after the first wet spring.
At some point the wall between old and new comes open, and everything above it needs somewhere to stand. Brad walks the existing structure first — foundation, framing, mechanicals — and sizes headers and beams for what's actually there. He's building onto your home, not around it.
Windows get staged early so there's no dead gap between framing and weathertight. Then the siding, soffit, fascia, and roofline get matched to your existing home — and if that means special-ordering a discontinued profile, Brad orders it. Close enough isn't good enough.
An addition means zoning setbacks, a building permit, and trade inspections through the City of Medina Building Department. Brad handles the drawings, applications, and every inspector visit. The paper trail protects the biggest investment you own when it's time to sell.
Follow a full addition build phase by phase — excavation to finished room — on the additions page, or browse the full portfolio.
A bedroom, a bigger kitchen, an in-law suite, a first-floor primary — or just "we're out of room." Vague is fine. Every addition starts as a conversation, not a bid.
He wants to see how you actually live in it — where the light comes from, how traffic moves, what you're gaining and what you can't lose. Then he walks the structure: foundation, framing, mechanicals, and the lot itself. The plan comes out of that, and it's one you won't be surprised by six months later.
Excavation, foundation, framing, rough-in, exterior, finish — line by line, nothing buried. Money is settled in the contract before a shovel touches your yard.
Excavation, foundation inspected, framing up, licensed subs on rough-in, dried in fast, exterior matched, interior finished to the trim. No handoffs, no subcontractor you've never met making decisions — Brad manages every phase and is on site through it.
Yes — an addition is real construction and gets the full treatment: zoning review for setbacks, a building permit, and electrical, plumbing, and HVAC inspections through the City of Medina Building Department. Brad handles the drawings, the applications, and every inspection as part of the job. You never deal with the counter.
Most room additions run two to four months of build time depending on size and scope — a single-room bump-out lands at the short end, a full in-law suite with a bath at the long end. Brad stages material orders early so the schedule has no dead time, and you get that schedule in writing before work starts.
That's the standard the job is built to. Siding, soffit, fascia, and roofing get matched to your existing home — special-ordered if the profile is discontinued — and the roofline gets tied in so the addition reads as original construction. When it's finished, it should look like it was always there, because it was designed to be.
Almost never. Most of the build happens outside your existing walls — the addition goes up, gets dried in and weathertight, and only then does the opening between old and new get cut. Your home stays sealed, secure, and livable through the noisy months, and the truly disruptive stretch is measured in days, not weeks.
It depends on size, what's in it — bathroom, kitchen work, second story — and how it ties into your home, so Brad doesn't quote blind and you shouldn't trust anyone who does. He walks your home, then you get a written, itemized estimate with every line explained. The walkthrough and the estimate cost you nothing.
Yes — it needs more care, not less possibility. Historic-district work can carry design review beyond the standard building permit, and the addition itself should be designed so the reviewers have nothing to object to: materials, massing, and detailing that respect the house. Brad sorts out exactly what the city requires for your street before the design is final, and builds so the addition reads as part of the original home.
Fill this out or call him directly. Either way you're talking to the person who builds it.
Brad will call you back the same day. If it's urgent, call him directly at 440-315-4438.